We got a warm day in December so it was on to patching up the mud hole in the front. As it turns out, there was a good bit of sidewalk that led up the old side door that went away...so now here it is moved to the front. It goes over top the trench for the geothermal - hope it doesn't settle too much (I compacted it as much as I could). Looks pretty good, I think.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment